We worked in four to six hours abundant. We did not do everything what we had, but we brought forward: Moved
- a ring mooring quay and improved the symmetry of the mooring deck.
- Developed all moorings and marked the sign of the peaks to find the right position.
- Order and cleanliness in the pool, washing all surfaces.
- Changed the pre-fuel filter.
- emptied cupboards and drawers, decided what to keep and landed the rest (including fifty kilograms of unused set of wrenches, shackles and chains Transatlantic, drills, saws, etc..
- wash the blanket.
- wash the stern and pasted the name "Amarcord."
- test the engine, found some smoke under load. We need the technical back control.
- Raised the minimum slightly.
- Without the awning and put that big winter white in summer.
0 comments:
Post a Comment